A mates been working on a fairing/screen for the swm.He has used my 630 for the mock ups and build.Not quite finished but i reckon its looking good
Haven't checked but at a guess i would say it would be do able. It does have a decent dash panel. One thing he is interested in is the headlight.To keep costs down the stock headlight could be used but if the light needs upgrading there are options to include a headlight in the kit. If you have any suggestions question's etc jump onto Joe's FB page https://www.facebook.com/jebtech.bikes/
Hi guys . My bikes been sitting for awhile with this project almost done then the brackets raided for ktm 690 kits. Anyway could be completed in the next few weeks possible using a ktm headlight.
For what it's worth... I'd much prefer to be able to reuse the stock headlight if he has the option. Cool project though and I have interest. .
Just looked at the web-site (yenkro fairing kits) and it looks like the TE 630 kit has not materialized, too bad!
Sorry guys,i have been slack and haven't got back up to my mates workshop to help finish it off. It may be getting revised with a clear section on the top. Joe has been very busy working on ktm and suzuki kits. If you are keen send him a message , it helps with deciding on producing more if there is enough interest. There's a contact form at the bottom of his web page http://www.jebtech.com.au/
I have ridden a drz400 with the same style fairing as the husky one above I use to think they were a bit of look thing but after riding the drz on a extended transport section at 110-120 kph i was sold .After 400km of riding i wasn't fatigued and my neck wasn't aching and that is when i decided i wanted one for my husky. Now some taller guys might have buffering but the is a little deflector that can be added to stop this.
Ok Still in the proto stage. The kit needs to be a bolt on ,most of it is.At this stage the key needs relocation and its loom extended(key is in right side of dash panel).Dash has a panel bolted to the risers or it too will need its loom extended to put it up on the fairing dash panel.Got a month to go before it goes on a 6000km shake down.At another workshop for engine freshen up and suspension work atm then back to yenkro for finishing touches at the end of the month.